Key Steps in Installing a Grid-Connected Solar Power System
1- Launch of the project between the STEG subscriber and SOLAR FM
- Request for Usage History
- Preparation of a quote followed by a contract for the installation of the photovoltaic system
2- Approval by STEG of the technical and administrative documentation
- Submission of the application by SOLAR FM
- Review of the application by STEG
3- Installation of the photovoltaic system by SOLAR FM
- Installation work
- Request for Acceptance and Commissioning
- Appointment scheduled by STEG
4- Technical Acceptance and Commissioning by STEG
- Verification of the Compliance of the Photovoltaic System
- Installation of the metering system
- Commissioning of the Photovoltaic System
Credit: STEG
- A loan of 3,500 dinars for solar installations with a capacity strictly under 2 kWp, to be repaid over 7 years via the STEG bill
- A credit of 6,500 dinars for systems with a capacity greater than 2 kWp and strictly less than 3 kWp, to be repaid over 7 years via the STEG bill.
- A credit of 7,500 dinars for systems with a capacity greater than 3 kWp and strictly less than 4 kWp, to be repaid over 7 years via the STEG bill.
- A credit of 10,000 dinars for solar installations exceeding 4 kWp, to be repaid over 7 years via the STEG bill.